Parkway Blvd. over Relocated Riter Canal
GoodSalt Lake County, Utah · 3950 W. 2700 S. W.Valley · Structure no. 035070D
- Built
- 1998
- 27 years old
- Condition
- Good
- inspected February 2024
- Type
- Frame
- Concrete
- Length
- 39 ft
- 1 main span
- Daily traffic
- 37,800
- 2010 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Parkway Blvd. over Relocated Riter Canal is a concrete frame carrying Parkway Blvd. over Relocated Riter Canal in Salt Lake County, Utah. It was built in 1998, so it is 27 years old, younger than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 37,800 vehicles a day, roughly 2% of them trucks, projected to reach 45,927 by 2030. The structure is 39 ft (12 m) long and 106 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Parkway Blvd. over Relocated Riter Canal built?
It was built in 1998, making it 27 years old in 2025.
What condition is Parkway Blvd. over Relocated Riter Canal in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does Parkway Blvd. over Relocated Riter Canal carry?
About 37,800 vehicles per day (2010 count), of which roughly 2% are trucks.
How long is Parkway Blvd. over Relocated Riter Canal?
The structure is 39 ft (12 m) long with a longest span of 36 ft (11 m) and a deck 106 ft wide.
Who owns Parkway Blvd. over Relocated Riter Canal?
It is owned by the City or Municipal Highway Agency.