I-84 (SR-84) Ebl over Cottonwood Creek
FairMorgan County, Utah · 1.4 Mi.East Mt.Green Int. · Structure no. 2F 97
- Built
- 1966
- 59 years old, rebuilt 2012
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 71 ft
- 1 main span
- Daily traffic
- 16,887
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
I-84 (SR-84) Ebl over Cottonwood Creek is a prestressed concrete stringer/multi-beam or girder carrying I-84 (SR-84) Ebl over Cottonwood Creek in Morgan County, Utah. It was built in 1966 and reconstructed in 2012, so it is 59 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 16,887 vehicles a day, roughly 42% of them trucks, projected to reach 20,264 by 2042. The structure is 71 ft (21.6 m) long and 40 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-84 (SR-84) Ebl over Cottonwood Creek built?
It was built in 1966, making it 59 years old in 2025. It was reconstructed in 2012.
What condition is I-84 (SR-84) Ebl over Cottonwood Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does I-84 (SR-84) Ebl over Cottonwood Creek carry?
About 16,887 vehicles per day (2022 count), of which roughly 42% are trucks.
How long is I-84 (SR-84) Ebl over Cottonwood Creek?
The structure is 71 ft (21.6 m) long with a longest span of 67 ft (20.4 m) and a deck 40 ft wide.
Who owns I-84 (SR-84) Ebl over Cottonwood Creek?
It is owned by the State Highway Agency.