US Bridges

500 West Street over Pedestrian Walkway

Good

Grand County, Utah · 100 South 500 West · Structure no. 019003V

Built
2003
22 years old
Condition
Good
inspected January 2024
Type
Culvert
Steel
Length
25 ft
1 main span
Daily traffic
2,659
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

500 West Street over Pedestrian Walkway is a steel culvert carrying 500 West Street over Pedestrian Walkway in Grand County, Utah. It was built in 2003, so it is 22 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,659 vehicles a day, roughly 2% of them trucks, projected to reach 3,191 by 2041. The structure is 25 ft (7.6 m) long. If it were closed, the detour would be 1.2 mi (2 km).

Carries500 West Street
CrossesPedestrian Walkway
Location100 South 500 West
RouteCity Street 1691
StateUtah
Coordinates38.57289, -109.56132
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Culvert7 GoodSome minor problems.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating107.1 US tons
Inventory rating106.5 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckNot applicable
Main spans1
Design loadHS 20 + Mod
Structure length25 ft (7.6 m)
Longest span25 ft (7.6 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deck99 ft (30.2 m)

Traffic and service

Average daily traffic2,659 (2021)
Projected traffic3,191 by 2041
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesPedestrian / bicycle
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 500 West Street over Pedestrian Walkway built?

It was built in 2003, making it 22 years old in 2025.

What condition is 500 West Street over Pedestrian Walkway in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in January 2024.

How much traffic does 500 West Street over Pedestrian Walkway carry?

About 2,659 vehicles per day (2021 count), of which roughly 2% are trucks.

How long is 500 West Street over Pedestrian Walkway?

The structure is 25 ft (7.6 m) long with a longest span of 25 ft (7.6 m).

Who owns 500 West Street over Pedestrian Walkway?

It is owned by the City or Municipal Highway Agency.