US Bridges

300 South Street over Mill Creek

Fair

Grand County, Utah · 150 East 300 South Moab · Structure no. 019007E

Built
1972
53 years old
Condition
Fair
inspected January 2024
Type
Culvert
Concrete Continuous
Length
55 ft
3 main spans
Daily traffic
568
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

300 South Street over Mill Creek is a concrete continuous culvert carrying 300 South Street over Mill Creek in Grand County, Utah. It was built in 1972, so it is 53 years old, older than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 568 vehicles a day, roughly 2% of them trucks, projected to reach 682 by 2041. The structure is 55 ft (16.8 m) long and 105 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

Carries300 South Street
CrossesMill Creek
Location150 East 300 South Moab
RouteCity Street 1696
StateUtah
Coordinates38.56858, -109.54781
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection3 SeriousLoss of section, deterioration, spalling or scour have seriously affected primary structural components.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJanuary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36.4 US tons
Inventory rating26.1 US tons

Structure

Structure typeCulvert
MaterialConcrete Continuous
DeckNot applicable
Main spans3
Design loadHS 20 + Mod
Structure length55 ft (16.8 m)
Longest span22 ft (6.7 m)
Deck width105 ft (32.1 m)
Roadway width70 ft (21.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic568 (2021)
Projected traffic682 by 2041
Trucks2%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was 300 South Street over Mill Creek built?

It was built in 1972, making it 53 years old in 2025.

What condition is 300 South Street over Mill Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2024.

How much traffic does 300 South Street over Mill Creek carry?

About 568 vehicles per day (2021 count), of which roughly 2% are trucks.

How long is 300 South Street over Mill Creek?

The structure is 55 ft (16.8 m) long with a longest span of 22 ft (6.7 m) and a deck 105 ft wide.

Who owns 300 South Street over Mill Creek?

It is owned by the City or Municipal Highway Agency.