US-40 (SR-40) over Starvation Reservoir
FairDuchesne County, Utah · 5 Miles West of Duchesne · Structure no. 0C 560
- Built
- 1969
- 56 years old
- Condition
- Fair
- inspected May 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 1,641 ft
- 8 main spans
- Daily traffic
- 5,490
- 2014 count
- Owner
- State
- State Highway Agency
About this bridge
US-40 (SR-40) over Starvation Reservoir is a steel continuous stringer/multi-beam or girder carrying US-40 (SR-40) over Starvation Reservoir in Duchesne County, Utah. It was built in 1969, so it is 56 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,490 vehicles a day, roughly 31% of them trucks, projected to reach 6,863 by 2034. The structure is 1,641 ft (500.3 m) long and 44 ft wide. If it were closed, the detour would be 49.7 mi (80 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US-40 (SR-40) over Starvation Reservoir built?
It was built in 1969, making it 56 years old in 2025.
What condition is US-40 (SR-40) over Starvation Reservoir in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.
How much traffic does US-40 (SR-40) over Starvation Reservoir carry?
About 5,490 vehicles per day (2014 count), of which roughly 31% are trucks.
How long is US-40 (SR-40) over Starvation Reservoir?
The structure is 1,641 ft (500.3 m) long with a longest span of 217 ft (66.1 m) and a deck 44 ft wide.
Who owns US-40 (SR-40) over Starvation Reservoir?
It is owned by the State Highway Agency.