US Bridges

SR 311 over Strawberry River

Good

Duchesne County, Utah · SR 311 O Strawberry Rvr · Structure no. 0F 876

Built
2020
5 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
81 ft
1 main span
Daily traffic
460
2023 count
Owner
State
State Highway Agency

About this bridge

SR 311 over Strawberry River is a prestressed concrete continuous stringer/multi-beam or girder carrying SR 311 over Strawberry River in Duchesne County, Utah. It was built in 2020, so it is 5 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 460 vehicles a day, roughly 53% of them trucks, projected to reach 600 by 2043. The structure is 81 ft (24.6 m) long and 35 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesSR 311
CrossesStrawberry River
LocationSR 311 O Strawberry Rvr
StateUtah
Coordinates40.1738, -110.429
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating78.6 US tons
Inventory rating50 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans1
Design loadUnknown
Structure length81 ft (24.6 m)
Longest span78 ft (23.7 m)
Deck width35 ft (10.6 m)
Roadway width32 ft (9.8 m)
Vertical clearance over deck0 ft (0 m)

Traffic and service

Average daily traffic460 (2023)
Projected traffic600 by 2043
Trucks53%
Lanes on structure2
Traffic directionHighway traffic not carried
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SR 311 over Strawberry River built?

It was built in 2020, making it 5 years old in 2025.

What condition is SR 311 over Strawberry River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does SR 311 over Strawberry River carry?

About 460 vehicles per day (2023 count), of which roughly 53% are trucks.

How long is SR 311 over Strawberry River?

The structure is 81 ft (24.6 m) long with a longest span of 78 ft (23.7 m) and a deck 35 ft wide.

Who owns SR 311 over Strawberry River?

It is owned by the State Highway Agency.