I-215 (SR-215) Wbl over UPRR and Uta Tracks
FairDavis County, Utah · .2 Mi.W.Jct.With I-15 Nsl · Structure no. 4F 126
- Built
- 1969
- 56 years old, rebuilt 2015
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 349 ft
- 5 main spans
- Daily traffic
- —
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I-215 (SR-215) Wbl over UPRR and Uta Tracks is a prestressed concrete stringer/multi-beam or girder carrying I-215 (SR-215) Wbl over UPRR and Uta Tracks in Davis County, Utah. It was built in 1969 and reconstructed in 2015, so it is 56 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
No traffic count is recorded. The structure is 349 ft (106.4 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-215 (SR-215) Wbl over UPRR and Uta Tracks built?
It was built in 1969, making it 56 years old in 2025. It was reconstructed in 2015.
What condition is I-215 (SR-215) Wbl over UPRR and Uta Tracks in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does I-215 (SR-215) Wbl over UPRR and Uta Tracks carry?
No traffic count is recorded for this structure.
How long is I-215 (SR-215) Wbl over UPRR and Uta Tracks?
The structure is 349 ft (106.4 m) long with a longest span of 91 ft (27.8 m) and a deck 43 ft wide.
Who owns I-215 (SR-215) Wbl over UPRR and Uta Tracks?
It is owned by the State Highway Agency.