US Bridges

Glovers Lane over SR-177

Good

Davis County, Utah · SR-177 West Davis · Structure no. 0F 935

Built
2023
2 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
160 ft
1 main span
Daily traffic
1,000
2023 count
Owner
State
State Highway Agency

About this bridge

Glovers Lane over SR-177 is a prestressed concrete stringer/multi-beam or girder carrying Glovers Lane over SR-177 in Davis County, Utah. It was built in 2023, so it is 2 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 5% of them trucks, projected to reach 4,500 by 2043. The structure is 160 ft (48.7 m) long and 53 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesGlovers Lane
CrossesSR-177
LocationSR-177 West Davis
RouteCity Street 1459
StateUtah
Coordinates40.965, -111.90995
Functional classRural Minor Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 22 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.7 US tons
Inventory rating42.9 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length160 ft (48.7 m)
Longest span156 ft (47.5 m)
Deck width53 ft (16.1 m)
Roadway width44 ft (13.3 m)
Vertical clearance over deck100 ft (30.5 m)

Traffic and service

Average daily traffic1,000 (2023)
Projected traffic4,500 by 2043
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Glovers Lane over SR-177 built?

It was built in 2023, making it 2 years old in 2025.

What condition is Glovers Lane over SR-177 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does Glovers Lane over SR-177 carry?

About 1,000 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is Glovers Lane over SR-177?

The structure is 160 ft (48.7 m) long with a longest span of 156 ft (47.5 m) and a deck 53 ft wide.

Who owns Glovers Lane over SR-177?

It is owned by the State Highway Agency.