US Bridges

Glover Lane over Farmington Creek

Fair

Davis County, Utah · 1350 W. Glover LN · Structure no. 011026D

Built
2005
20 years old
Condition
Fair
inspected March 2024
Type
Slab
Concrete
Length
26 ft
1 main span
Daily traffic
252
2010 count
Owner
County
County Highway Agency

About this bridge

Glover Lane over Farmington Creek is a concrete slab carrying Glover Lane over Farmington Creek in Davis County, Utah. It was built in 2005, so it is 20 years old, younger than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 252 vehicles a day, roughly 1% of them trucks, projected to reach 306 by 2030. The structure is 26 ft (7.8 m) long and 106 ft wide.

CarriesGlover Lane
CrossesFarmington Creek
Location1350 W. Glover LN
RouteCounty Highway 0
StateUtah
Coordinates40.965, -111.91722
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating35.7 US tons
Inventory rating21.4 US tons

Structure

Structure typeSlab
MaterialConcrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length26 ft (7.8 m)
Longest span24 ft (7.3 m)
Deck width106 ft (32.2 m)
Roadway width22 ft (6.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic252 (2010)
Projected traffic306 by 2030
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo
Strategic Highway NetworkNon-Interstate STRAHNET route

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Glover Lane over Farmington Creek built?

It was built in 2005, making it 20 years old in 2025.

What condition is Glover Lane over Farmington Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does Glover Lane over Farmington Creek carry?

About 252 vehicles per day (2010 count), of which roughly 1% are trucks.

How long is Glover Lane over Farmington Creek?

The structure is 26 ft (7.8 m) long with a longest span of 24 ft (7.3 m) and a deck 106 ft wide.

Who owns Glover Lane over Farmington Creek?

It is owned by the County Highway Agency.