SR-13 over Malad River & Co. Road
FairBox Elder County, Utah · East of Garland · Structure no. 0F 478
- Built
- 1985
- 40 years old
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 199 ft
- 2 main spans
- Daily traffic
- 3,297
- 2017 count
- Owner
- State
- State Highway Agency
About this bridge
SR-13 over Malad River & Co. Road is a prestressed concrete continuous stringer/multi-beam or girder carrying SR-13 over Malad River & Co. Road in Box Elder County, Utah. It was built in 1985, so it is 40 years old, younger than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,297 vehicles a day, roughly 37% of them trucks, projected to reach 3,956 by 2037. The structure is 199 ft (60.8 m) long and 46 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SR-13 over Malad River & Co. Road built?
It was built in 1985, making it 40 years old in 2025.
What condition is SR-13 over Malad River & Co. Road in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does SR-13 over Malad River & Co. Road carry?
About 3,297 vehicles per day (2017 count), of which roughly 37% are trucks.
How long is SR-13 over Malad River & Co. Road?
The structure is 199 ft (60.8 m) long with a longest span of 98 ft (30 m) and a deck 46 ft wide.
Who owns SR-13 over Malad River & Co. Road?
It is owned by the State Highway Agency.