US Bridges

City Road-Garland over Malad River

FairPosted for load

Box Elder County, Utah · Se. Side of Garland · Structure no. 003044F

Built
1965
60 years old
Condition
Fair
inspected November 2023
Type
Tee Beam
Prestressed Concrete
Length
51 ft
1 main span
Daily traffic
630
2010 count
Owner
City
City or Municipal Highway Agency

About this bridge

City Road-Garland over Malad River is a prestressed concrete tee beam carrying City Road-Garland over Malad River in Box Elder County, Utah. It was built in 1965, so it is 60 years old, older than the Utah average of 40.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 630 vehicles a day, roughly 1% of them trucks, projected to reach 765 by 2030. The structure is 51 ft (15.5 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).

CarriesCity Road-Garland
CrossesMalad River
LocationSe. Side of Garland
RouteCity Street 1129
StateUtah
Coordinates41.72662, -112.15078
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourCountermeasures installed to correct a previously existing problem
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating39.2 US tons
Inventory rating28.5 US tons

Structure

Structure typeTee Beam
MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHL 93
Structure length51 ft (15.5 m)
Longest span50 ft (15.2 m)
Deck width28 ft (8.6 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic630 (2010)
Projected traffic765 by 2030
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.1 mi (5 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was City Road-Garland over Malad River built?

It was built in 1965, making it 60 years old in 2025.

What condition is City Road-Garland over Malad River in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does City Road-Garland over Malad River carry?

About 630 vehicles per day (2010 count), of which roughly 1% are trucks.

How long is City Road-Garland over Malad River?

The structure is 51 ft (15.5 m) long with a longest span of 50 ft (15.2 m) and a deck 28 ft wide.

Who owns City Road-Garland over Malad River?

It is owned by the City or Municipal Highway Agency.