300 East Street over Box Elder Creek
FairPosted for loadBox Elder County, Utah · 300 N. 300 E.Brigham City · Structure no. 003064D
- Built
- 1930
- 95 years old, rebuilt 1950
- Condition
- Fair
- inspected November 2023
- Type
- Frame
- Concrete
- Length
- 26 ft
- 1 main span
- Daily traffic
- 693
- 2010 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
300 East Street over Box Elder Creek is a concrete frame carrying 300 East Street over Box Elder Creek in Box Elder County, Utah. It was built in 1930 and reconstructed in 1950, so it is 95 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 693 vehicles a day, roughly 1% of them trucks, projected to reach 842 by 2030. The structure is 26 ft (7.9 m) long and 98 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 300 East Street over Box Elder Creek built?
It was built in 1930, making it 95 years old in 2025. It was reconstructed in 1950.
What condition is 300 East Street over Box Elder Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does 300 East Street over Box Elder Creek carry?
About 693 vehicles per day (2010 count), of which roughly 1% are trucks.
How long is 300 East Street over Box Elder Creek?
The structure is 26 ft (7.9 m) long with a longest span of 24 ft (7.2 m) and a deck 98 ft wide.
Who owns 300 East Street over Box Elder Creek?
It is owned by the City or Municipal Highway Agency.