County Road over Bear River
FairPosted for loadBox Elder County, Utah · West of Cutler Dam · Structure no. 003041C
- Built
- 1954
- 71 years old, rebuilt 2014
- Condition
- Fair
- inspected November 2023
- Type
- Truss - Deck
- Steel Continuous
- Length
- 225 ft
- 3 main spans
- Daily traffic
- 25
- 2013 count
- Owner
- County
- County Highway Agency
About this bridge
County Road over Bear River is a steel continuous truss - deck carrying County Road over Bear River in Box Elder County, Utah. It was built in 1954 and reconstructed in 2014, so it is 71 years old, older than the Utah average of 40.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 25 vehicles a day, roughly 2% of them trucks, projected to reach 31 by 2030. The structure is 225 ft (68.6 m) long and 12 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Road over Bear River built?
It was built in 1954, making it 71 years old in 2025. It was reconstructed in 2014.
What condition is County Road over Bear River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does County Road over Bear River carry?
About 25 vehicles per day (2013 count), of which roughly 2% are trucks.
How long is County Road over Bear River?
The structure is 225 ft (68.6 m) long with a longest span of 75 ft (22.9 m) and a deck 12 ft wide.
Who owns County Road over Bear River?
It is owned by the County Highway Agency.