US Bridges

CR 194/ Scobee RD over Salt Creek

Good

Young County, Texas · 1.70 MI E of SH 251 · Structure no. 032520AA0194001

Built
1990
35 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Concrete
Length
84 ft
2 main spans
Daily traffic
30
2020 count
Owner
County
County Highway Agency

About this bridge

CR 194/ Scobee RD over Salt Creek is a concrete stringer/multi-beam or girder carrying CR 194/ Scobee RD over Salt Creek in Young County, Texas. It was built in 1990, so it is 35 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 30 vehicles a day, roughly 3% of them trucks, projected to reach 18 by 2042. The structure is 84 ft (25.6 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCR 194/ Scobee RD
CrossesSalt Creek
Location1.70 MI E of SH 251
RouteCounty Highway 0
StateTexas
Coordinates33.30041, -98.71117
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour evaluation has not been made
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length84 ft (25.6 m)
Longest span42 ft (12.8 m)
Deck width31 ft (9.4 m)
Roadway width29 ft (8.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30 (2020)
Projected traffic18 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CR 194/ Scobee RD over Salt Creek built?

It was built in 1990, making it 35 years old in 2025.

What condition is CR 194/ Scobee RD over Salt Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does CR 194/ Scobee RD over Salt Creek carry?

About 30 vehicles per day (2020 count), of which roughly 3% are trucks.

How long is CR 194/ Scobee RD over Salt Creek?

The structure is 84 ft (25.6 m) long with a longest span of 42 ft (12.8 m) and a deck 31 ft wide.

Who owns CR 194/ Scobee RD over Salt Creek?

It is owned by the County Highway Agency.