CR 294/ True RD over Little Salt Creek
GoodYoung County, Texas · 5.55 MI E of SH 251 · Structure no. 032520AA0294002
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 60 ft
- 1 main span
- Daily traffic
- 36
- 2020 count
- Owner
- County
- County Highway Agency
About this bridge
CR 294/ True RD over Little Salt Creek is a prestressed concrete stringer/multi-beam or girder carrying CR 294/ True RD over Little Salt Creek in Young County, Texas. It was built in 2008, so it is 17 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 36 vehicles a day, roughly 5% of them trucks, projected to reach 50 by 2024. The structure is 60 ft (18.3 m) long and 26 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CR 294/ True RD over Little Salt Creek built?
It was built in 2008, making it 17 years old in 2025.
What condition is CR 294/ True RD over Little Salt Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does CR 294/ True RD over Little Salt Creek carry?
About 36 vehicles per day (2020 count), of which roughly 5% are trucks.
How long is CR 294/ True RD over Little Salt Creek?
The structure is 60 ft (18.3 m) long with a longest span of 58 ft (17.7 m) and a deck 26 ft wide.
Who owns CR 294/ True RD over Little Salt Creek?
It is owned by the County Highway Agency.