US Bridges

San Gabriel Pkwy over Draw

Good

Williamson County, Texas · 0.4 MI W of Bagdad RD · Structure no. 142460H66528001

Built
2022
3 years old
Condition
Good
inspected November 2024
Type
Culvert
Concrete
Length
39 ft
4 main spans
Daily traffic
200
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

San Gabriel Pkwy over Draw is a concrete culvert carrying San Gabriel Pkwy over Draw in Williamson County, Texas. It was built in 2022, so it is 3 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, roughly 1% of them trucks, projected to reach 1,000 by 2042. The structure is 39 ft (11.9 m) long.

CarriesSan Gabriel Pkwy
CrossesDraw
Location0.4 MI W of Bagdad RD
RouteCity Street 0
StateTexas
Coordinates30.59332, -97.88999
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans4
Design loadHL 93
Structure length39 ft (11.9 m)
Longest span8 ft (2.4 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2022)
Projected traffic1,000 by 2042
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was San Gabriel Pkwy over Draw built?

It was built in 2022, making it 3 years old in 2025.

What condition is San Gabriel Pkwy over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does San Gabriel Pkwy over Draw carry?

About 200 vehicles per day (2022 count), of which roughly 1% are trucks.

How long is San Gabriel Pkwy over Draw?

The structure is 39 ft (11.9 m) long with a longest span of 8 ft (2.4 m).

Who owns San Gabriel Pkwy over Draw?

It is owned by the City or Municipal Highway Agency.