Halsey DR over Drainage Ditch

Good

Williamson County, Texas · 0.3 MI NE of Bagdad RD · Structure no. 142460H02438001

Built
2006
19 years old
Condition
Good
inspected November 2023
Type
Culvert
Concrete
Length
44 ft
6 main spans
Daily traffic
2,000
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

Halsey DR over Drainage Ditch is a concrete culvert carrying Halsey DR over Drainage Ditch in Williamson County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,000 vehicles a day, roughly 1% of them trucks, projected to reach 3,500 by 2038. The structure is 44 ft (13.4 m) long and 71 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHalsey DR
CrossesDrainage Ditch
Location0.3 MI NE of Bagdad RD
RouteCity Street 0
StateTexas
Coordinates30.59094, -97.87542
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, precast panels
Main spans6
Design loadHS 20
Structure length44 ft (13.4 m)
Longest span6 ft (1.8 m)
Deck width71 ft (21.7 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,000 (2018)
Projected traffic3,500 by 2038
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Halsey DR over Drainage Ditch built?

It was built in 2006, making it 19 years old in 2025.

What condition is Halsey DR over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2023.

How much traffic does Halsey DR over Drainage Ditch carry?

About 2,000 vehicles per day (2018 count), of which roughly 1% are trucks.

How long is Halsey DR over Drainage Ditch?

The structure is 44 ft (13.4 m) long with a longest span of 6 ft (1.8 m) and a deck 71 ft wide.

Who owns Halsey DR over Drainage Ditch?

It is owned by the City or Municipal Highway Agency.