US Bridges

Landing Lane over Draw

Good

Williamson County, Texas · 0.4 MI N of Hero Way W · Structure no. 142460E92807001

Built
2022
3 years old
Condition
Good
inspected October 2024
Type
Culvert
Concrete
Length
60 ft
5 main spans
Daily traffic
204
2020 count
Owner
City
City or Municipal Highway Agency

About this bridge

Landing Lane over Draw is a concrete culvert carrying Landing Lane over Draw in Williamson County, Texas. It was built in 2022, so it is 3 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 204 vehicles a day, roughly 3% of them trucks, projected to reach 204 by 2042. The structure is 60 ft (18.3 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesLanding Lane
CrossesDraw
Location0.4 MI N of Hero Way W
RouteCity Street 0
StateTexas
Coordinates30.57671, -97.88718
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans5
Design loadUnknown
Structure length60 ft (18.3 m)
Longest span10 ft (3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic204 (2020)
Projected traffic204 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Landing Lane over Draw built?

It was built in 2022, making it 3 years old in 2025.

What condition is Landing Lane over Draw in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.

How much traffic does Landing Lane over Draw carry?

About 204 vehicles per day (2020 count), of which roughly 3% are trucks.

How long is Landing Lane over Draw?

The structure is 60 ft (18.3 m) long with a longest span of 10 ft (3 m).

Who owns Landing Lane over Draw?

It is owned by the City or Municipal Highway Agency.