US Bridges

Chandler RD over SH130 Ml & NB Toll Plaza

Good

Williamson County, Texas · 3.8 MI N of US 79 · Structure no. 142460044005046

Built
2006
19 years old
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
404 ft
2 main spans
Daily traffic
1,000
2016 count
Owner
State
State Highway Agency

About this bridge

Chandler RD over SH130 Ml & NB Toll Plaza is a prestressed concrete stringer/multi-beam or girder carrying Chandler RD over SH130 Ml & NB Toll Plaza in Williamson County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,000 vehicles a day, roughly 2% of them trucks, projected to reach 2,500 by 2036. The structure is 404 ft (123.1 m) long and 114 ft wide. If it were closed, the detour would be 5 mi (8 km).

CarriesChandler RD
CrossesSH130 Ml & NB Toll Plaza
Location3.8 MI N of US 79
RouteCounty Highway 0
StateTexas
Coordinates30.59099, -97.5933
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans2 (+1 approach)
Design loadHS 20
Structure length404 ft (123.1 m)
Longest span159 ft (48.5 m)
Deck width114 ft (34.7 m)
Roadway width98 ft (30 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,000 (2016)
Projected traffic2,500 by 2036
Trucks2%
Lanes on structure6
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed5 mi (8 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Chandler RD over SH130 Ml & NB Toll Plaza built?

It was built in 2006, making it 19 years old in 2025.

What condition is Chandler RD over SH130 Ml & NB Toll Plaza in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Chandler RD over SH130 Ml & NB Toll Plaza carry?

About 1,000 vehicles per day (2016 count), of which roughly 2% are trucks.

How long is Chandler RD over SH130 Ml & NB Toll Plaza?

The structure is 404 ft (123.1 m) long with a longest span of 159 ft (48.5 m) and a deck 114 ft wide.

Who owns Chandler RD over SH130 Ml & NB Toll Plaza?

It is owned by the State Highway Agency.