US Bridges

Chandler RD over Drain

Good

Williamson County, Texas · 0.15 MI W of CR 100 · Structure no. 142460AA0533008

Built
2007
18 years old
Condition
Good
inspected September 2023
Type
Culvert
Concrete
Length
24 ft
3 main spans
Daily traffic
13,095
2020 count
Owner
County
County Highway Agency

About this bridge

Chandler RD over Drain is a concrete culvert carrying Chandler RD over Drain in Williamson County, Texas. It was built in 2007, so it is 18 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,095 vehicles a day, roughly 29% of them trucks, projected to reach 18,333 by 2040. The structure is 24 ft (7.3 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesChandler RD
CrossesDrain
Location0.15 MI W of CR 100
RouteCounty Highway 0
StateTexas
Coordinates30.58762, -97.57159
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans3
Design loadHL 93
Structure length24 ft (7.3 m)
Longest span6 ft (1.8 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,095 (2020)
Projected traffic18,333 by 2040
Trucks29%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Chandler RD over Drain built?

It was built in 2007, making it 18 years old in 2025.

What condition is Chandler RD over Drain in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does Chandler RD over Drain carry?

About 13,095 vehicles per day (2020 count), of which roughly 29% are trucks.

How long is Chandler RD over Drain?

The structure is 24 ft (7.3 m) long with a longest span of 6 ft (1.8 m).

Who owns Chandler RD over Drain?

It is owned by the County Highway Agency.