US Bridges

CO RD 129 over Peach Creek

Fair

Wharton County, Texas · 2.33 MI S of FM 1161 · Structure no. 132410AA0255001

Built
1985
40 years old
Condition
Fair
inspected April 2024
Type
Other
Other
Length
110 ft
2 main spans
Daily traffic
598
2022 count
Owner
County
County Highway Agency

About this bridge

CO RD 129 over Peach Creek is a other other carrying CO RD 129 over Peach Creek in Wharton County, Texas. It was built in 1985, so it is 40 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 598 vehicles a day, roughly 3% of them trucks, projected to reach 87 by 2042. The structure is 110 ft (33.5 m) long and 29 ft wide. If it were closed, the detour would be 6.8 mi (11 km).

CarriesCO RD 129
CrossesPeach Creek
Location2.33 MI S of FM 1161
RouteCounty Highway 0
StateTexas
Coordinates29.34802, -96.04964
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating46 US tons
Inventory rating27 US tons

Structure

Structure typeOther
MaterialOther
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length110 ft (33.5 m)
Longest span58 ft (17.7 m)
Deck width29 ft (8.8 m)
Roadway width29 ft (8.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic598 (2022)
Projected traffic87 by 2042
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed6.8 mi (11 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was CO RD 129 over Peach Creek built?

It was built in 1985, making it 40 years old in 2025.

What condition is CO RD 129 over Peach Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does CO RD 129 over Peach Creek carry?

About 598 vehicles per day (2022 count), of which roughly 3% are trucks.

How long is CO RD 129 over Peach Creek?

The structure is 110 ft (33.5 m) long with a longest span of 58 ft (17.7 m) and a deck 29 ft wide.

Who owns CO RD 129 over Peach Creek?

It is owned by the County Highway Agency.