CO RD 117 over Peach Creek
FairWharton County, Texas · 4.82 MI N of FM 3012 · Structure no. 132410AA0244001
- Built
- 1983
- 42 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Concrete
- Length
- 336 ft
- 11 main spans
- Daily traffic
- 672
- 2022 count
- Owner
- County
- County Highway Agency
About this bridge
CO RD 117 over Peach Creek is a concrete stringer/multi-beam or girder carrying CO RD 117 over Peach Creek in Wharton County, Texas. It was built in 1983, so it is 42 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 672 vehicles a day, roughly 3% of them trucks, projected to reach 87 by 2042. The structure is 336 ft (102.4 m) long and 30 ft wide. If it were closed, the detour would be 9.9 mi (16 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was CO RD 117 over Peach Creek built?
It was built in 1983, making it 42 years old in 2025.
What condition is CO RD 117 over Peach Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does CO RD 117 over Peach Creek carry?
About 672 vehicles per day (2022 count), of which roughly 3% are trucks.
How long is CO RD 117 over Peach Creek?
The structure is 336 ft (102.4 m) long with a longest span of 30 ft (9.1 m) and a deck 30 ft wide.
Who owns CO RD 117 over Peach Creek?
It is owned by the County Highway Agency.