Mcpherson RD over Manadas Creek Tributary
GoodWebb County, Texas · 0.25 MI N Shiloh RD · Structure no. 222400B00765003
- Built
- 1998
- 27 years old
- Condition
- Good
- inspected October 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 100 ft
- 2 main spans
- Daily traffic
- 19,242
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Mcpherson RD over Manadas Creek Tributary is a prestressed concrete box beam or girders - multiple carrying Mcpherson RD over Manadas Creek Tributary in Webb County, Texas. It was built in 1998, so it is 27 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 19,242 vehicles a day, roughly 8% of them trucks, projected to reach 26,939 by 2042. The structure is 100 ft (30.5 m) long and 81 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mcpherson RD over Manadas Creek Tributary built?
It was built in 1998, making it 27 years old in 2025.
What condition is Mcpherson RD over Manadas Creek Tributary in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Mcpherson RD over Manadas Creek Tributary carry?
About 19,242 vehicles per day (2023 count), of which roughly 8% are trucks.
How long is Mcpherson RD over Manadas Creek Tributary?
The structure is 100 ft (30.5 m) long with a longest span of 50 ft (15.2 m) and a deck 81 ft wide.
Who owns Mcpherson RD over Manadas Creek Tributary?
It is owned by the City or Municipal Highway Agency.