US Bridges

Genoa DR over Drainage Ditch

Good

Travis County, Texas · 0.15 W of Bilbrook Pl · Structure no. 142270B09801001

Built
1990
35 years old
Condition
Good
inspected May 2024
Type
Culvert
Concrete
Length
23 ft
2 main spans
Daily traffic
2,000
2018 count
Owner
City
City or Municipal Highway Agency

About this bridge

Genoa DR over Drainage Ditch is a concrete culvert carrying Genoa DR over Drainage Ditch in Travis County, Texas. It was built in 1990, so it is 35 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,000 vehicles a day, projected to reach 3,000 by 2038. The structure is 23 ft (7.1 m) long and 52 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesGenoa DR
CrossesDrainage Ditch
Location0.15 W of Bilbrook Pl
RouteCity Street 0
StateTexas
Coordinates30.172, -97.81938
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans2
Design loadUnknown
Structure length23 ft (7.1 m)
Longest span11 ft (3.4 m)
Deck width52 ft (15.9 m)
Roadway width44 ft (13.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,000 (2018)
Projected traffic3,000 by 2038
Trucks—
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Genoa DR over Drainage Ditch built?

It was built in 1990, making it 35 years old in 2025.

What condition is Genoa DR over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does Genoa DR over Drainage Ditch carry?

About 2,000 vehicles per day (2018 count).

How long is Genoa DR over Drainage Ditch?

The structure is 23 ft (7.1 m) long with a longest span of 11 ft (3.4 m) and a deck 52 ft wide.

Who owns Genoa DR over Drainage Ditch?

It is owned by the City or Municipal Highway Agency.