US Bridges

SH 130 NB over Harold Green RD

Good

Travis County, Texas · 2.0 MI SW of FM 969 · Structure no. 142270044006101

Built
2007
18 years old, rebuilt 2020
Condition
Good
inspected September 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
285 ft
3 main spans
Daily traffic
5,000
2017 count
Owner
State
State Highway Agency

About this bridge

SH 130 NB over Harold Green RD is a prestressed concrete stringer/multi-beam or girder carrying SH 130 NB over Harold Green RD in Travis County, Texas. It was built in 2007 and reconstructed in 2020, so it is 18 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 5,000 vehicles a day, roughly 15% of them trucks, projected to reach 21,183 by 2037. The structure is 285 ft (86.9 m) long and 58 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSH 130 NB
CrossesHarold Green RD
Location2.0 MI SW of FM 969
StateTexas
Coordinates30.2288, -97.61967
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating60 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans3
Design loadHS 25 or greater
Structure length285 ft (86.9 m)
Longest span110 ft (33.5 m)
Deck width58 ft (17.7 m)
Roadway width56 ft (17.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,000 (2017)
Projected traffic21,183 by 2037
Trucks15%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was SH 130 NB over Harold Green RD built?

It was built in 2007, making it 18 years old in 2025. It was reconstructed in 2020.

What condition is SH 130 NB over Harold Green RD in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does SH 130 NB over Harold Green RD carry?

About 5,000 vehicles per day (2017 count), of which roughly 15% are trucks.

How long is SH 130 NB over Harold Green RD?

The structure is 285 ft (86.9 m) long with a longest span of 110 ft (33.5 m) and a deck 58 ft wide.

Who owns SH 130 NB over Harold Green RD?

It is owned by the State Highway Agency.