SH 130 NB over Colorado River
GoodTravis County, Texas · 3.1 MI S of FM 969 · Structure no. 142270044006103
- Built
- 2007
- 18 years old, rebuilt 2020
- Condition
- Good
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 1,740 ft
- 3 main spans
- Daily traffic
- 5,000
- 2010 count
- Owner
- State
- State Highway Agency
About this bridge
SH 130 NB over Colorado River is a prestressed concrete stringer/multi-beam or girder carrying SH 130 NB over Colorado River in Travis County, Texas. It was built in 2007 and reconstructed in 2020, so it is 18 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,000 vehicles a day, roughly 15% of them trucks, projected to reach 21,271 by 2030. The structure is 1,740 ft (530.4 m) long and 70 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH 130 NB over Colorado River built?
It was built in 2007, making it 18 years old in 2025. It was reconstructed in 2020.
What condition is SH 130 NB over Colorado River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.
How much traffic does SH 130 NB over Colorado River carry?
About 5,000 vehicles per day (2010 count), of which roughly 15% are trucks.
How long is SH 130 NB over Colorado River?
The structure is 1,740 ft (530.4 m) long with a longest span of 150 ft (45.7 m) and a deck 70 ft wide.
Who owns SH 130 NB over Colorado River?
It is owned by the State Highway Agency.