SH71WB to IH35NB over IH 35 Nbfr & SH 71 Wbfr
GoodTravis County, Texas · IH 35/SH 71 Interchange · Structure no. 142270011313465
- Built
- 2005
- 20 years old
- Condition
- Good
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 2,020 ft
- 20 main spans
- Daily traffic
- 10,000
- 2013 count
- Owner
- State
- State Highway Agency
About this bridge
SH71WB to IH35NB over IH 35 Nbfr & SH 71 Wbfr is a prestressed concrete stringer/multi-beam or girder carrying SH71WB to IH35NB over IH 35 Nbfr & SH 71 Wbfr in Travis County, Texas. It was built in 2005, so it is 20 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10,000 vehicles a day, roughly 15% of them trucks, projected to reach 15,000 by 2033. The structure is 2,020 ft (615.7 m) long and 28 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SH71WB to IH35NB over IH 35 Nbfr & SH 71 Wbfr built?
It was built in 2005, making it 20 years old in 2025.
What condition is SH71WB to IH35NB over IH 35 Nbfr & SH 71 Wbfr in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2023.
How much traffic does SH71WB to IH35NB over IH 35 Nbfr & SH 71 Wbfr carry?
About 10,000 vehicles per day (2013 count), of which roughly 15% are trucks.
How long is SH71WB to IH35NB over IH 35 Nbfr & SH 71 Wbfr?
The structure is 2,020 ft (615.7 m) long with a longest span of 115 ft (35.1 m) and a deck 28 ft wide.
Who owns SH71WB to IH35NB over IH 35 Nbfr & SH 71 Wbfr?
It is owned by the State Highway Agency.