IH 35NB to SH 71EB over IH 35 Nbfr; SH 71 Ebfr
GoodTravis County, Texas · IH 35/US 290/SH 71 Intrch · Structure no. 142270001513543
- Built
- 2011
- 14 years old
- Condition
- Good
- inspected August 2023
- Type
- Box Beam or Girders - Multiple
- Steel Continuous
- Length
- 2,160 ft
- 1 main span
- Daily traffic
- 12,390
- 2011 count
- Owner
- State
- State Highway Agency
About this bridge
IH 35NB to SH 71EB over IH 35 Nbfr; SH 71 Ebfr is a steel continuous box beam or girders - multiple carrying IH 35NB to SH 71EB over IH 35 Nbfr; SH 71 Ebfr in Travis County, Texas. It was built in 2011, so it is 14 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 12,390 vehicles a day, roughly 15% of them trucks, projected to reach 17,340 by 2031. The structure is 2,160 ft (658.4 m) long and 28 ft wide.
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was IH 35NB to SH 71EB over IH 35 Nbfr; SH 71 Ebfr built?
It was built in 2011, making it 14 years old in 2025.
What condition is IH 35NB to SH 71EB over IH 35 Nbfr; SH 71 Ebfr in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.
How much traffic does IH 35NB to SH 71EB over IH 35 Nbfr; SH 71 Ebfr carry?
About 12,390 vehicles per day (2011 count), of which roughly 15% are trucks.
How long is IH 35NB to SH 71EB over IH 35 Nbfr; SH 71 Ebfr?
The structure is 2,160 ft (658.4 m) long with a longest span of 241 ft (73.5 m) and a deck 28 ft wide.
Who owns IH 35NB to SH 71EB over IH 35 Nbfr; SH 71 Ebfr?
It is owned by the State Highway Agency.