US Bridges

Timberland Blvd over Drainage Ditch

Good

Tarrant County, Texas · 0.28 MI E of Park Vista B · Structure no. 022200ZT3036001

Built
2008
17 years old, rebuilt 2019
Condition
Good
inspected March 2024
Type
Culvert
Concrete
Length
40 ft
6 main spans
Daily traffic
617
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

Timberland Blvd over Drainage Ditch is a concrete culvert carrying Timberland Blvd over Drainage Ditch in Tarrant County, Texas. It was built in 2008 and reconstructed in 2019, so it is 17 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 617 vehicles a day, roughly 1% of them trucks, projected to reach 300 by 2036. The structure is 40 ft (12.2 m) long and 85 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesTimberland Blvd
CrossesDrainage Ditch
Location0.28 MI E of Park Vista B
RouteCity Street 0
StateTexas
Coordinates32.95558, -97.25969
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans6
Design loadUnknown
Structure length40 ft (12.2 m)
Longest span6 ft (1.8 m)
Deck width85 ft (25.9 m)
Roadway width65 ft (19.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic617 (2019)
Projected traffic300 by 2036
Trucks1%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Timberland Blvd over Drainage Ditch built?

It was built in 2008, making it 17 years old in 2025. It was reconstructed in 2019.

What condition is Timberland Blvd over Drainage Ditch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Timberland Blvd over Drainage Ditch carry?

About 617 vehicles per day (2019 count), of which roughly 1% are trucks.

How long is Timberland Blvd over Drainage Ditch?

The structure is 40 ft (12.2 m) long with a longest span of 6 ft (1.8 m) and a deck 85 ft wide.

Who owns Timberland Blvd over Drainage Ditch?

It is owned by the City or Municipal Highway Agency.