US Bridges

US 377 over Marshall Branch

Good

Tarrant County, Texas · 2.3 MI N of FM 1709 · Structure no. 022200008102031

Built
2009
16 years old
Condition
Good
inspected May 2024
Type
Culvert
Concrete
Length
64 ft
6 main spans
Daily traffic
19,486
2020 count
Owner
State
State Highway Agency

About this bridge

US 377 over Marshall Branch is a concrete culvert carrying US 377 over Marshall Branch in Tarrant County, Texas. It was built in 2009, so it is 16 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 19,486 vehicles a day, roughly 11% of them trucks, projected to reach 23,640 by 2029. The structure is 64 ft (19.5 m) long and 116 ft wide. If it were closed, the detour would be 14.3 mi (23 km).

CarriesUS 377
CrossesMarshall Branch
Location2.3 MI N of FM 1709
RouteU.S. Route 377
StateTexas
Coordinates32.96678, -97.24841
Functional classUrban Other Principal Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionMay 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, precast panels
Main spans6
Design loadHS 20
Structure length64 ft (19.5 m)
Longest span9 ft (2.7 m)
Deck width116 ft (35.4 m)
Roadway width68 ft (20.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic19,486 (2020)
Projected traffic23,640 by 2029
Trucks11%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed14.3 mi (23 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 377 over Marshall Branch built?

It was built in 2009, making it 16 years old in 2025.

What condition is US 377 over Marshall Branch in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.

How much traffic does US 377 over Marshall Branch carry?

About 19,486 vehicles per day (2020 count), of which roughly 11% are trucks.

How long is US 377 over Marshall Branch?

The structure is 64 ft (19.5 m) long with a longest span of 9 ft (2.7 m) and a deck 116 ft wide.

Who owns US 377 over Marshall Branch?

It is owned by the State Highway Agency.