Shoshoni DR over Trib Dosier Creek
GoodTarrant County, Texas · 0.1 MI N of Cibolo Hills · Structure no. 022200ZS4290001
- Built
- 2021
- 4 years old
- Condition
- Good
- inspected February 2024
- Type
- Culvert
- Concrete
- Length
- 48 ft
- 5 main spans
- Daily traffic
- 200
- 2021 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Shoshoni DR over Trib Dosier Creek is a concrete culvert carrying Shoshoni DR over Trib Dosier Creek in Tarrant County, Texas. It was built in 2021, so it is 4 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 200 vehicles a day, projected to reach 1,500 by 2040. The structure is 48 ft (14.6 m) long and 74 ft wide. If it were closed, the detour would be 98.8 mi (159 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 7 Good | Some minor problems. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Shoshoni DR over Trib Dosier Creek built?
It was built in 2021, making it 4 years old in 2025.
What condition is Shoshoni DR over Trib Dosier Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does Shoshoni DR over Trib Dosier Creek carry?
About 200 vehicles per day (2021 count).
How long is Shoshoni DR over Trib Dosier Creek?
The structure is 48 ft (14.6 m) long with a longest span of 8 ft (2.4 m) and a deck 74 ft wide.
Who owns Shoshoni DR over Trib Dosier Creek?
It is owned by the City or Municipal Highway Agency.