US Bridges

Cibolo Hills Pkwy over Trib Dosier Creek

Good

Tarrant County, Texas · 0.2 MI SW of US 287 Bus · Structure no. 022200ZC4626001

Built
2021
4 years old
Condition
Good
inspected February 2024
Type
Culvert
Concrete
Length
64 ft
5 main spans
Daily traffic
200
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Cibolo Hills Pkwy over Trib Dosier Creek is a concrete culvert carrying Cibolo Hills Pkwy over Trib Dosier Creek in Tarrant County, Texas. It was built in 2021, so it is 4 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 200 vehicles a day, projected to reach 1,500 by 2040. The structure is 64 ft (19.5 m) long and 114 ft wide. If it were closed, the detour would be 98.8 mi (159 km).

CarriesCibolo Hills Pkwy
CrossesTrib Dosier Creek
Location0.2 MI SW of US 287 Bus
RouteCity Street 0
StateTexas
Coordinates32.91039, -97.40861
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 12 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans5
Design loadHL 93
Structure length64 ft (19.5 m)
Longest span7 ft (2.1 m)
Deck width114 ft (34.7 m)
Roadway width21 ft (6.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic200 (2021)
Projected traffic1,500 by 2040
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed98.8 mi (159 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Cibolo Hills Pkwy over Trib Dosier Creek built?

It was built in 2021, making it 4 years old in 2025.

What condition is Cibolo Hills Pkwy over Trib Dosier Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Cibolo Hills Pkwy over Trib Dosier Creek carry?

About 200 vehicles per day (2021 count).

How long is Cibolo Hills Pkwy over Trib Dosier Creek?

The structure is 64 ft (19.5 m) long with a longest span of 7 ft (2.1 m) and a deck 114 ft wide.

Who owns Cibolo Hills Pkwy over Trib Dosier Creek?

It is owned by the City or Municipal Highway Agency.