US Bridges

Sand ST over Trib to W Fork Trinity

Good

Tarrant County, Texas · .125 MI W of Gravel ST · Structure no. 022200ZS0950001

Built
1977
48 years old
Condition
Good
inspected March 2024
Type
Culvert
Concrete
Length
27 ft
4 main spans
Daily traffic
330
2009 count
Owner
City
City or Municipal Highway Agency

About this bridge

Sand ST over Trib to W Fork Trinity is a concrete culvert carrying Sand ST over Trib to W Fork Trinity in Tarrant County, Texas. It was built in 1977, so it is 48 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 330 vehicles a day, roughly 11% of them trucks, projected to reach 100 by 2036. The structure is 27 ft (8.1 m) long and 60 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesSand ST
CrossesTrib to W Fork Trinity
Location.125 MI W of Gravel ST
RouteCity Street 0
StateTexas
Coordinates32.79609, -97.21912
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length27 ft (8.1 m)
Longest span6 ft (1.9 m)
Deck width60 ft (18.3 m)
Roadway width40 ft (12.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic330 (2009)
Projected traffic100 by 2036
Trucks11%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sand ST over Trib to W Fork Trinity built?

It was built in 1977, making it 48 years old in 2025.

What condition is Sand ST over Trib to W Fork Trinity in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Sand ST over Trib to W Fork Trinity carry?

About 330 vehicles per day (2009 count), of which roughly 11% are trucks.

How long is Sand ST over Trib to W Fork Trinity?

The structure is 27 ft (8.1 m) long with a longest span of 6 ft (1.9 m) and a deck 60 ft wide.

Who owns Sand ST over Trib to W Fork Trinity?

It is owned by the City or Municipal Highway Agency.