US Bridges

Trinity Blvd EB over IH-820

Fair

Tarrant County, Texas · 2.5 MI N of IH 30 · Structure no. 022200000813181

Built
1969
56 years old
Condition
Fair
inspected April 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
206 ft
2 main spans
Daily traffic
6,025
2019 count
Owner
State
State Highway Agency

About this bridge

Trinity Blvd EB over IH-820 is a prestressed concrete stringer/multi-beam or girder carrying Trinity Blvd EB over IH-820 in Tarrant County, Texas. It was built in 1969, so it is 56 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 6,025 vehicles a day, projected to reach 14,205 by 2034. The structure is 206 ft (62.8 m) long and 40 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesTrinity Blvd EB
CrossesIH-820
Location2.5 MI N of IH 30
RouteCity Street 0
StateTexas
Coordinates32.79762, -97.21261
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51 US tons
Inventory rating30 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2 (+2 approach)
Design loadH 20
Structure length206 ft (62.8 m)
Longest span62 ft (18.9 m)
Deck width40 ft (12.1 m)
Roadway width35 ft (10.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic6,025 (2019)
Projected traffic14,205 by 2034
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Trinity Blvd EB over IH-820 built?

It was built in 1969, making it 56 years old in 2025.

What condition is Trinity Blvd EB over IH-820 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does Trinity Blvd EB over IH-820 carry?

About 6,025 vehicles per day (2019 count).

How long is Trinity Blvd EB over IH-820?

The structure is 206 ft (62.8 m) long with a longest span of 62 ft (18.9 m) and a deck 40 ft wide.

Who owns Trinity Blvd EB over IH-820?

It is owned by the State Highway Agency.