High Summit TR over Big Fossil Creek
GoodTarrant County, Texas · 0.25 MI E of W Robertson · Structure no. 022200ZH5510001
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 120 ft
- 1 main span
- Daily traffic
- 1,200
- 2020 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
High Summit TR over Big Fossil Creek is a prestressed concrete stringer/multi-beam or girder carrying High Summit TR over Big Fossil Creek in Tarrant County, Texas. It was built in 2018, so it is 7 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,200 vehicles a day, roughly 3% of them trucks, projected to reach 2,200 by 2040. The structure is 120 ft (36.6 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was High Summit TR over Big Fossil Creek built?
It was built in 2018, making it 7 years old in 2025.
What condition is High Summit TR over Big Fossil Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does High Summit TR over Big Fossil Creek carry?
About 1,200 vehicles per day (2020 count), of which roughly 3% are trucks.
How long is High Summit TR over Big Fossil Creek?
The structure is 120 ft (36.6 m) long with a longest span of 120 ft (36.6 m) and a deck 46 ft wide.
Who owns High Summit TR over Big Fossil Creek?
It is owned by the City or Municipal Highway Agency.