US Bridges

Lakemont DR over Trib Big Fossil Creek

Good

Tarrant County, Texas · 0.15 MI W of Berkshire Lk · Structure no. 022200ZL0526001

Built
2019
6 years old
Condition
Good
inspected February 2024
Type
Culvert
Concrete
Length
107 ft
11 main spans
Daily traffic
1,500
2021 count
Owner
City
City or Municipal Highway Agency

About this bridge

Lakemont DR over Trib Big Fossil Creek is a concrete culvert carrying Lakemont DR over Trib Big Fossil Creek in Tarrant County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 1,500 vehicles a day, roughly 3% of them trucks, projected to reach 2,200 by 2040. The structure is 107 ft (32.6 m) long and 76 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesLakemont DR
CrossesTrib Big Fossil Creek
Location0.15 MI W of Berkshire Lk
RouteCity Street 0
StateTexas
Coordinates32.91214, -97.35728
Functional classUrban Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans11
Design loadUnknown
Structure length107 ft (32.6 m)
Longest span9 ft (2.7 m)
Deck width76 ft (23.1 m)
Roadway width36 ft (10.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,500 (2021)
Projected traffic2,200 by 2040
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Lakemont DR over Trib Big Fossil Creek built?

It was built in 2019, making it 6 years old in 2025.

What condition is Lakemont DR over Trib Big Fossil Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does Lakemont DR over Trib Big Fossil Creek carry?

About 1,500 vehicles per day (2021 count), of which roughly 3% are trucks.

How long is Lakemont DR over Trib Big Fossil Creek?

The structure is 107 ft (32.6 m) long with a longest span of 9 ft (2.7 m) and a deck 76 ft wide.

Who owns Lakemont DR over Trib Big Fossil Creek?

It is owned by the City or Municipal Highway Agency.