US Bridges

Bellaire DR S over Trib to Clr Fork Trinity

Fair

Tarrant County, Texas · 0.25 MI N of Bryant Irvin · Structure no. 022200ZB1960004

Built
1986
39 years old
Condition
Fair
inspected March 2024
Type
Culvert
Concrete
Length
42 ft
4 main spans
Daily traffic
1,509
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Bellaire DR S over Trib to Clr Fork Trinity is a concrete culvert carrying Bellaire DR S over Trib to Clr Fork Trinity in Tarrant County, Texas. It was built in 1986, so it is 39 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,509 vehicles a day, projected to reach 3,240 by 2034. The structure is 42 ft (12.8 m) long and 70 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesBellaire DR S
CrossesTrib to Clr Fork Trinity
Location0.25 MI N of Bryant Irvin
RouteCity Street 0
StateTexas
Coordinates32.66478, -97.42887
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation6: Equal to present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length42 ft (12.8 m)
Longest span10 ft (3 m)
Deck width70 ft (21.3 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,509 (2024)
Projected traffic3,240 by 2034
Trucks0%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Bellaire DR S over Trib to Clr Fork Trinity built?

It was built in 1986, making it 39 years old in 2025.

What condition is Bellaire DR S over Trib to Clr Fork Trinity in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2024.

How much traffic does Bellaire DR S over Trib to Clr Fork Trinity carry?

About 1,509 vehicles per day (2024 count).

How long is Bellaire DR S over Trib to Clr Fork Trinity?

The structure is 42 ft (12.8 m) long with a longest span of 10 ft (3 m) and a deck 70 ft wide.

Who owns Bellaire DR S over Trib to Clr Fork Trinity?

It is owned by the City or Municipal Highway Agency.