US Bridges

Harris Parkway over Trib Clr Frk Trinity Riv

Fair

Tarrant County, Texas · 0.5 MI S Oakmont Blvd · Structure no. 022200ZH2000001

Built
1986
39 years old
Condition
Fair
inspected February 2024
Type
Culvert
Concrete
Length
52 ft
6 main spans
Daily traffic
7,288
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Harris Parkway over Trib Clr Frk Trinity Riv is a concrete culvert carrying Harris Parkway over Trib Clr Frk Trinity Riv in Tarrant County, Texas. It was built in 1986, so it is 39 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 7,288 vehicles a day, projected to reach 1,340 by 2036. The structure is 52 ft (15.9 m) long and 80 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesHarris Parkway
CrossesTrib Clr Frk Trinity Riv
Location0.5 MI S Oakmont Blvd
RouteCity Street 0
StateTexas
Coordinates32.65381, -97.41924
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans6
Design loadHS 20
Structure length52 ft (15.9 m)
Longest span8 ft (2.4 m)
Deck width80 ft (24.4 m)
Roadway width60 ft (18.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic7,288 (2024)
Projected traffic1,340 by 2036
Trucks0%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Harris Parkway over Trib Clr Frk Trinity Riv built?

It was built in 1986, making it 39 years old in 2025.

What condition is Harris Parkway over Trib Clr Frk Trinity Riv in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does Harris Parkway over Trib Clr Frk Trinity Riv carry?

About 7,288 vehicles per day (2024 count).

How long is Harris Parkway over Trib Clr Frk Trinity Riv?

The structure is 52 ft (15.9 m) long with a longest span of 8 ft (2.4 m) and a deck 80 ft wide.

Who owns Harris Parkway over Trib Clr Frk Trinity Riv?

It is owned by the City or Municipal Highway Agency.