US Bridges

Altamesa Blvd Ebl over BNSF RR

Good

Tarrant County, Texas · 0.3 MI W of Crowley RD · Structure no. 022200ZA2910003

Built
1989
36 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
70 ft
1 main span
Daily traffic
13,002
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Altamesa Blvd Ebl over BNSF RR is a prestressed concrete stringer/multi-beam or girder carrying Altamesa Blvd Ebl over BNSF RR in Tarrant County, Texas. It was built in 1989, so it is 36 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 13,002 vehicles a day, projected to reach 28,162 by 2034. The structure is 70 ft (21.3 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesAltamesa Blvd Ebl
CrossesBNSF RR
Location0.3 MI W of Crowley RD
RouteCity Street 0
StateTexas
Coordinates32.64893, -97.35332
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length70 ft (21.3 m)
Longest span70 ft (21.3 m)
Deck width43 ft (13.1 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic13,002 (2024)
Projected traffic28,162 by 2034
Trucks0%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$63,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was Altamesa Blvd Ebl over BNSF RR built?

It was built in 1989, making it 36 years old in 2025.

What condition is Altamesa Blvd Ebl over BNSF RR in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Altamesa Blvd Ebl over BNSF RR carry?

About 13,002 vehicles per day (2024 count).

How long is Altamesa Blvd Ebl over BNSF RR?

The structure is 70 ft (21.3 m) long with a longest span of 70 ft (21.3 m) and a deck 43 ft wide.

Who owns Altamesa Blvd Ebl over BNSF RR?

It is owned by the City or Municipal Highway Agency.