US Bridges

Altamesa Blvd Wbl over TR Sycamore Creek

Good

Tarrant County, Texas · 0.1 MI East of Mccart · Structure no. 022200ZA2910002

Built
1981
44 years old
Condition
Good
inspected March 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
80 ft
1 main span
Daily traffic
9,425
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Altamesa Blvd Wbl over TR Sycamore Creek is a prestressed concrete stringer/multi-beam or girder carrying Altamesa Blvd Wbl over TR Sycamore Creek in Tarrant County, Texas. It was built in 1981, so it is 44 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 9,425 vehicles a day, projected to reach 21,043 by 2034. The structure is 80 ft (24.4 m) long and 42 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesAltamesa Blvd Wbl
CrossesTR Sycamore Creek
Location0.1 MI East of Mccart
RouteCity Street 0
StateTexas
Coordinates32.64948, -97.36423
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionMarch 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry2: Basically intolerable, requiring high priority of replacement
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length80 ft (24.4 m)
Longest span78 ft (23.8 m)
Deck width42 ft (12.7 m)
Roadway width33 ft (10.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,425 (2024)
Projected traffic21,043 by 2034
Trucks0%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$6,000
NavigationNo navigation control on waterway

Frequently asked questions

When was Altamesa Blvd Wbl over TR Sycamore Creek built?

It was built in 1981, making it 44 years old in 2025.

What condition is Altamesa Blvd Wbl over TR Sycamore Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2024.

How much traffic does Altamesa Blvd Wbl over TR Sycamore Creek carry?

About 9,425 vehicles per day (2024 count).

How long is Altamesa Blvd Wbl over TR Sycamore Creek?

The structure is 80 ft (24.4 m) long with a longest span of 78 ft (23.8 m) and a deck 42 ft wide.

Who owns Altamesa Blvd Wbl over TR Sycamore Creek?

It is owned by the City or Municipal Highway Agency.