Winscott-Plover RD over Timber Creek Diversion
GoodTarrant County, Texas · 1.0 MI E of HWY 377 · Structure no. 022200VV0340002
- Built
- 1992
- 33 years old
- Condition
- Good
- inspected February 2024
- Type
- Culvert
- Concrete
- Length
- 22 ft
- 2 main spans
- Daily traffic
- 8,678
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Winscott-Plover RD over Timber Creek Diversion is a concrete culvert carrying Winscott-Plover RD over Timber Creek Diversion in Tarrant County, Texas. It was built in 1992, so it is 33 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 8,678 vehicles a day, roughly 3% of them trucks, projected to reach 9,486 by 2042. The structure is 22 ft (6.7 m) long and 68 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Culvert | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Winscott-Plover RD over Timber Creek Diversion built?
It was built in 1992, making it 33 years old in 2025.
What condition is Winscott-Plover RD over Timber Creek Diversion in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does Winscott-Plover RD over Timber Creek Diversion carry?
About 8,678 vehicles per day (2024 count), of which roughly 3% are trucks.
How long is Winscott-Plover RD over Timber Creek Diversion?
The structure is 22 ft (6.7 m) long with a longest span of 10 ft (3 m) and a deck 68 ft wide.
Who owns Winscott-Plover RD over Timber Creek Diversion?
It is owned by the City or Municipal Highway Agency.