US Bridges

John Reagan Street over Timber Creek

Good

Tarrant County, Texas · .03 MI S of Darnell · Structure no. 022200VV0155001

Built
1985
40 years old
Condition
Good
inspected February 2024
Type
Culvert
Concrete
Length
29 ft
3 main spans
Daily traffic
201
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

John Reagan Street over Timber Creek is a concrete culvert carrying John Reagan Street over Timber Creek in Tarrant County, Texas. It was built in 1985, so it is 40 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 201 vehicles a day, projected to reach 400 by 2034. The structure is 29 ft (8.8 m) long and 51 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesJohn Reagan Street
CrossesTimber Creek
Location.03 MI S of Darnell
RouteCity Street 0
StateTexas
Coordinates32.67145, -97.45647
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert7 GoodSome minor problems.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating44 US tons
Inventory rating26 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length29 ft (8.8 m)
Longest span9 ft (2.7 m)
Deck width51 ft (15.4 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic201 (2024)
Projected traffic400 by 2034
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was John Reagan Street over Timber Creek built?

It was built in 1985, making it 40 years old in 2025.

What condition is John Reagan Street over Timber Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.

How much traffic does John Reagan Street over Timber Creek carry?

About 201 vehicles per day (2024 count).

How long is John Reagan Street over Timber Creek?

The structure is 29 ft (8.8 m) long with a longest span of 9 ft (2.7 m) and a deck 51 ft wide.

Who owns John Reagan Street over Timber Creek?

It is owned by the City or Municipal Highway Agency.