US Bridges

Marys Creek Drive over Plantation Creek West

Fair

Tarrant County, Texas · 0.3 Mi. S. of Chapin Road · Structure no. 022200VV0185002

Built
2008
17 years old
Condition
Fair
inspected February 2024
Type
Culvert
Concrete
Length
73 ft
4 main spans
Daily traffic
294
2024 count
Owner
City
City or Municipal Highway Agency

About this bridge

Marys Creek Drive over Plantation Creek West is a concrete culvert carrying Marys Creek Drive over Plantation Creek West in Tarrant County, Texas. It was built in 2008, so it is 17 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 294 vehicles a day, projected to reach 290 by 2034. The structure is 73 ft (22.3 m) long and 52 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMarys Creek Drive
CrossesPlantation Creek West
Location0.3 Mi. S. of Chapin Road
RouteCity Street 0
StateTexas
Coordinates32.71218, -97.46739
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; action required to protect exposed foundations
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length73 ft (22.3 m)
Longest span17 ft (5.2 m)
Deck width52 ft (15.7 m)
Roadway width30 ft (9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic294 (2024)
Projected traffic290 by 2034
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Marys Creek Drive over Plantation Creek West built?

It was built in 2008, making it 17 years old in 2025.

What condition is Marys Creek Drive over Plantation Creek West in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does Marys Creek Drive over Plantation Creek West carry?

About 294 vehicles per day (2024 count).

How long is Marys Creek Drive over Plantation Creek West?

The structure is 73 ft (22.3 m) long with a longest span of 17 ft (5.2 m) and a deck 52 ft wide.

Who owns Marys Creek Drive over Plantation Creek West?

It is owned by the City or Municipal Highway Agency.