US Bridges

Chapin RD over Plantation West Creek

Fair

Tarrant County, Texas · 0.6 MI E of IH 820 · Structure no. 022200VV0024001

Built
1948
77 years old
Condition
Fair
inspected February 2024
Type
Culvert
Concrete
Length
29 ft
3 main spans
Daily traffic
2,802
2022 count
Owner
City
City or Municipal Highway Agency

About this bridge

Chapin RD over Plantation West Creek is a concrete culvert carrying Chapin RD over Plantation West Creek in Tarrant County, Texas. It was built in 1948, so it is 77 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 2,802 vehicles a day, projected to reach 3,462 by 2034. The structure is 29 ft (8.8 m) long and 48 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesChapin RD
CrossesPlantation West Creek
Location0.6 MI E of IH 820
RouteCity Street 0
StateTexas
Coordinates32.71741, -97.46913
Functional classUrban Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating36 US tons
Inventory rating27 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckConcrete, cast-in-place
Main spans3
Design loadUnknown
Structure length29 ft (8.8 m)
Longest span9 ft (2.7 m)
Deck width48 ft (14.6 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,802 (2022)
Projected traffic3,462 by 2034
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Chapin RD over Plantation West Creek built?

It was built in 1948, making it 77 years old in 2025.

What condition is Chapin RD over Plantation West Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.

How much traffic does Chapin RD over Plantation West Creek carry?

About 2,802 vehicles per day (2022 count).

How long is Chapin RD over Plantation West Creek?

The structure is 29 ft (8.8 m) long with a longest span of 9 ft (2.7 m) and a deck 48 ft wide.

Who owns Chapin RD over Plantation West Creek?

It is owned by the City or Municipal Highway Agency.