US Bridges

Sheri Lane over Lorean (mesquite) Br

Good

Tarrant County, Texas · 0.1 MI N of Pipeline RD · Structure no. 022200E03880001

Built
1990
35 years old
Condition
Good
inspected July 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
42 ft
1 main span
Daily traffic
206
2019 count
Owner
City
City or Municipal Highway Agency

About this bridge

Sheri Lane over Lorean (mesquite) Br is a prestressed concrete box beam or girders - multiple carrying Sheri Lane over Lorean (mesquite) Br in Tarrant County, Texas. It was built in 1990, so it is 35 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 206 vehicles a day, roughly 1% of them trucks, projected to reach 230 by 2039. The structure is 42 ft (12.8 m) long and 40 ft wide.

CarriesSheri Lane
CrossesLorean (mesquite) Br
Location0.1 MI N of Pipeline RD
RouteCity Street 0
StateTexas
Coordinates32.82455, -97.17719
Functional classUrban Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection7 GoodSome minor problems.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20
Structure length42 ft (12.8 m)
Longest span42 ft (12.8 m)
Deck width40 ft (12.3 m)
Roadway width30 ft (9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic206 (2019)
Projected traffic230 by 2039
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sheri Lane over Lorean (mesquite) Br built?

It was built in 1990, making it 35 years old in 2025.

What condition is Sheri Lane over Lorean (mesquite) Br in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does Sheri Lane over Lorean (mesquite) Br carry?

About 206 vehicles per day (2019 count), of which roughly 1% are trucks.

How long is Sheri Lane over Lorean (mesquite) Br?

The structure is 42 ft (12.8 m) long with a longest span of 42 ft (12.8 m) and a deck 40 ft wide.

Who owns Sheri Lane over Lorean (mesquite) Br?

It is owned by the City or Municipal Highway Agency.