Pipeline RD over Lorean (mesquite) Br
GoodTarrant County, Texas · 0.6 MI E of Precinct Line · Structure no. 022200E03360002
- Built
- 2006
- 19 years old
- Condition
- Good
- inspected July 2024
- Type
- Slab
- Concrete Continuous
- Length
- 82 ft
- 1 main span
- Daily traffic
- 10,150
- 2019 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Pipeline RD over Lorean (mesquite) Br is a concrete continuous slab carrying Pipeline RD over Lorean (mesquite) Br in Tarrant County, Texas. It was built in 2006, so it is 19 years old, younger than the Texas average of 44.4 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 10,150 vehicles a day, roughly 4% of them trucks, projected to reach 16,360 by 2039. The structure is 82 ft (25 m) long and 70 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Pipeline RD over Lorean (mesquite) Br built?
It was built in 2006, making it 19 years old in 2025.
What condition is Pipeline RD over Lorean (mesquite) Br in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.
How much traffic does Pipeline RD over Lorean (mesquite) Br carry?
About 10,150 vehicles per day (2019 count), of which roughly 4% are trucks.
How long is Pipeline RD over Lorean (mesquite) Br?
The structure is 82 ft (25 m) long with a longest span of 33 ft (10 m) and a deck 70 ft wide.
Who owns Pipeline RD over Lorean (mesquite) Br?
It is owned by the City or Municipal Highway Agency.