US Bridges

SH 360 SB on Ramp over IH-30 EB

Good

Tarrant County, Texas · 1.2 Mi. N. of SH 180 · Structure no. 022200106802551

Built
2021
4 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
566 ft
3 main spans
Daily traffic
15,900
2015 count
Owner
State
State Highway Agency

About this bridge

SH 360 SB on Ramp over IH-30 EB is a prestressed concrete stringer/multi-beam or girder carrying SH 360 SB on Ramp over IH-30 EB in Tarrant County, Texas. It was built in 2021, so it is 4 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 15,900 vehicles a day, roughly 5% of them trucks, projected to reach 20,800 by 2035. The structure is 566 ft (172.5 m) long and 28 ft wide.

CarriesSH 360 SB on Ramp
CrossesIH-30 EB
Location1.2 Mi. N. of SH 180
RouteState Highway 360
StateTexas
Coordinates32.75966, -97.06363
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJune 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3 (+3 approach)
Design loadHL 93
Structure length566 ft (172.5 m)
Longest span120 ft (36.6 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,900 (2015)
Projected traffic20,800 by 2035
Trucks5%
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 360 SB on Ramp over IH-30 EB built?

It was built in 2021, making it 4 years old in 2025.

What condition is SH 360 SB on Ramp over IH-30 EB in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does SH 360 SB on Ramp over IH-30 EB carry?

About 15,900 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is SH 360 SB on Ramp over IH-30 EB?

The structure is 566 ft (172.5 m) long with a longest span of 120 ft (36.6 m) and a deck 28 ft wide.

Who owns SH 360 SB on Ramp over IH-30 EB?

It is owned by the State Highway Agency.