US Bridges

SH 360 SB Ft. Rd. over IH30 & Trib. Johnson Crk

Fair

Tarrant County, Texas · 1.2 Mi. N. of US-80 · Structure no. 022200106802550

Built
2019
6 years old
Condition
Fair
inspected June 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
1,191 ft
9 main spans
Daily traffic
21,100
2015 count
Owner
State
State Highway Agency

About this bridge

SH 360 SB Ft. Rd. over IH30 & Trib. Johnson Crk is a prestressed concrete stringer/multi-beam or girder carrying SH 360 SB Ft. Rd. over IH30 & Trib. Johnson Crk in Tarrant County, Texas. It was built in 2019, so it is 6 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 21,100 vehicles a day, roughly 5% of them trucks, projected to reach 31,800 by 2035. The structure is 1,191 ft (363 m) long and 57 ft wide.

CarriesSH 360 SB Ft. Rd.
CrossesIH30 & Trib. Johnson Crk
Location1.2 Mi. N. of US-80
RouteState Highway 360
StateTexas
Coordinates32.7592, -97.0643
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans9 (+3 approach)
Design loadHL 93
Structure length1,191 ft (363 m)
Longest span118 ft (36 m)
Deck width57 ft (17.5 m)
Roadway width37 ft (11.2 m)
Vertical clearance over deck17 ft (5.3 m)

Traffic and service

Average daily traffic21,100 (2015)
Projected traffic31,800 by 2035
Trucks5%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway and waterway
Detour if closed—
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was SH 360 SB Ft. Rd. over IH30 & Trib. Johnson Crk built?

It was built in 2019, making it 6 years old in 2025.

What condition is SH 360 SB Ft. Rd. over IH30 & Trib. Johnson Crk in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does SH 360 SB Ft. Rd. over IH30 & Trib. Johnson Crk carry?

About 21,100 vehicles per day (2015 count), of which roughly 5% are trucks.

How long is SH 360 SB Ft. Rd. over IH30 & Trib. Johnson Crk?

The structure is 1,191 ft (363 m) long with a longest span of 118 ft (36 m) and a deck 57 ft wide.

Who owns SH 360 SB Ft. Rd. over IH30 & Trib. Johnson Crk?

It is owned by the State Highway Agency.