US Bridges

IH 30 WB over Trib to Village Creek

Good

Tarrant County, Texas · 2.30 MI W of FM 157 · Structure no. 022200106802287

Built
1997
28 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
170 ft
2 main spans
Daily traffic
65,251
2019 count
Owner
State
State Highway Agency

About this bridge

IH 30 WB over Trib to Village Creek is a prestressed concrete stringer/multi-beam or girder carrying IH 30 WB over Trib to Village Creek in Tarrant County, Texas. It was built in 1997, so it is 28 years old, younger than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 65,251 vehicles a day, roughly 8% of them trucks, projected to reach 93,610 by 2035. The structure is 170 ft (51.8 m) long and 82 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesIH 30 WB
CrossesTrib to Village Creek
Location2.30 MI W of FM 157
RouteInterstate 30
StateTexas
Coordinates32.75993, -97.13654
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating36 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length170 ft (51.8 m)
Longest span90 ft (27.4 m)
Deck width82 ft (25 m)
Roadway width58 ft (17.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic65,251 (2019)
Projected traffic93,610 by 2035
Trucks8%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IH 30 WB over Trib to Village Creek built?

It was built in 1997, making it 28 years old in 2025.

What condition is IH 30 WB over Trib to Village Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does IH 30 WB over Trib to Village Creek carry?

About 65,251 vehicles per day (2019 count), of which roughly 8% are trucks.

How long is IH 30 WB over Trib to Village Creek?

The structure is 170 ft (51.8 m) long with a longest span of 90 ft (27.4 m) and a deck 82 ft wide.

Who owns IH 30 WB over Trib to Village Creek?

It is owned by the State Highway Agency.