US Bridges

Fielder Road SB over IH 30

Fair

Tarrant County, Texas · 2.10 MI W of FM 157 · Structure no. 022200106802039

Built
1957
68 years old
Condition
Fair
inspected May 2023
Type
Tee Beam
Concrete Continuous
Length
233 ft
4 main spans
Daily traffic
11,250
2015 count
Owner
State
State Highway Agency

About this bridge

Fielder Road SB over IH 30 is a concrete continuous tee beam carrying Fielder Road SB over IH 30 in Tarrant County, Texas. It was built in 1957, so it is 68 years old, older than the Texas average of 44.4 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 11,250 vehicles a day, projected to reach 11,300 by 2035. The structure is 233 ft (71 m) long and 32 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesFielder Road SB
CrossesIH 30
Location2.10 MI W of FM 157
RouteCity Street 713
StateTexas
Coordinates32.7597, -97.13164
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52 US tons
Inventory rating31 US tons

Structure

Structure typeTee Beam
MaterialConcrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadH 20
Structure length233 ft (71 m)
Longest span68 ft (20.7 m)
Deck width32 ft (9.9 m)
Roadway width27 ft (8.2 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,250 (2015)
Projected traffic11,300 by 2035
Trucks0%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$155,000
NavigationNot applicable (no waterway)

Frequently asked questions

When was Fielder Road SB over IH 30 built?

It was built in 1957, making it 68 years old in 2025.

What condition is Fielder Road SB over IH 30 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2023.

How much traffic does Fielder Road SB over IH 30 carry?

About 11,250 vehicles per day (2015 count).

How long is Fielder Road SB over IH 30?

The structure is 233 ft (71 m) long with a longest span of 68 ft (20.7 m) and a deck 32 ft wide.

Who owns Fielder Road SB over IH 30?

It is owned by the State Highway Agency.